Installation · Poznań, Poland

Four Points by Sheraton Poznań: custom 6-tap Limbus T with pipes to the ceiling

Like the Four Points by Sheraton in Wrocław, the hotel bar of Four Points by Sheraton Poznań has a custom Limbus T with six taps and copper pipes curving up into the ceiling.

Custom Limbus T copper beer tower with 6 taps and copper pipes bent to the ceiling at Four Points by Sheraton Poznań
Four Points by Sheraton Poznań – the taps and wooden handles along the beam
Four Points by Sheraton Poznań – the copper pipe rising to the ceiling
VenueFour Points by Sheraton – hotel bar, Poznań (PL)
ModelLimbus T, custom
Taps6, on a central post
Pipe workSolid copper, bent up to the ceiling
Tap handlesWood
MedallionsNumbered 1–6

A frame around the bar

The central Limbus T post carries the six taps; from the ends of its arms, solid copper pipes curve up into the ceiling. The python and cables run inside the copper, so the counter stays clear and the tower reads as one continuous copper frame around the back bar.

The photos and clips below were taken right after installation, before the bar opened – the protective film is still on some of the equipment.

Repeatable for hotel groups

Because every tower is made to order from our own drawings, a hotel group can roll out the same design across several properties and adapt only the dimensions to each counter. Poznań and Wrocław share the concept, not the exact measurements.

Want something similar?

Every tower is made to order in our workshop in Bielsko-Biała, Poland, and shipped across Europe. The model used here – Limbus T – can be configured online with an exact net price; custom pipe work, medallions and finishes are quoted individually. Lead time is about 14 working days.

More guides

Copper beer towers in this article
WhatsApp